18. Further Development and a Look into the Future
Radotín Town Centre
Radotín has undergone turbulent development over the past more than 150 years, the beginnings of which can be found in the construction of the railway line and the development of industry. The individual enterprises were initially located even in the very centre of the town. From the middle of the 20th century, the trend reversed and the original plants were gradually moved outside the centre (the cement plant to the quarries, the others to the eastern outskirts). However, after demolitions, ruins, waste, wrecked vehicles and other remnants often remained...

1924: Railway, Vindyš Factory and cement plant
Photo: Archive of the Radotín Local History Commission
Osvoboditelů Square itself began to be built up with prefabricated apartment blocks, a heating plant and service facilities in the 1980s. From the 1990s onwards, other neglected places gradually disappeared.

2011: Before the demolition of the derelict buildings

In 2022, this place was more of a central car park than a place for pleasant living.

In the second half of 2024, the demolition of the building of the former accumulator factory took place, where most of the administrative departments of the Radotín municipal office had been located for almost 20 years, as well as the adjacent technical buildings, for the purpose of modernising the Radotín centre.
The ceremonial laying of the foundation stone of the Centrum Radotín (Trio) project took place on 21 May 2025.

Another milestone at the beginning of 2026 was the demolition of the old boiler house, on the site of which a new town hall will stand.
A new shopping street, a central square, apartment buildings and a town hall will finally give Radotín a modern town centre with accessible services in one place, conveniently located near the railway station.

Visualisation of Centrum Radotín
Author: Doma je doma

Visualisation of Centrum Radotín: View from the stream and from the post office
Author: Doma je doma

Visualisation of the new town hall, the completion of which is expected in 2029
Author: Michal Fišer
Railway
The railway is also changing. Since the end of 2019, it has been undergoing a general reconstruction—so-called optimisation. This is the first reconstruction on such a large scale since 1862, when the original railway line was built.

2021: Railway underpass under construction
Photo gallery of the optimisation of the railway line in Radotín on Facebook:
https://www.facebook.com/media/set/?set=a.4862494550504295&type=3
The building of the new railway station, the station building and the platforms with a barrier-free underpass were opened on 15 December 2023. The construction of the modernised corridor from Smíchov has so far ended at the football field; according to plans, it should continue towards Černošice around 2028–2030.
Footbridge over the Radotín Stream
On 1 September 2023, a completely new bridge for pedestrians and cyclists was opened over the Radotín Stream and a busy class-II road. Thanks to this, pedestrians can safely get from the centre of the municipal district to the school buildings (one of the pillars of the so-called School Street) or to the sports facilities.